problem description
when you encounter a problem with ECharts in a development project, you need to render a chart about sleep
the environmental background of the problems and what methods you have tried
as shown in the figure above, the sum of the three groups of data is the total sleep time, and
is different sleep quality at different time stages
related codes
/ / Please paste the code text below (please do not replace the code with pictures)
the code will not be posted. I wrote that several schemes are wrong
what result do you expect? What is the error message actually seen?
I hope the Great God can save me. I really have a big head
or write an example to have a look. Thank you. Thank you!